SOURCE: Page 1, line 12; (03)AM020903.1. -->
Page 1, line 12, delete "However, for purposes of sections 2
through 18 of this".
Page 1, delete lines 13 through 17.
Page 2, line 9, delete "substantial evidence that:" and insert "
the
evidence that the proposed facility will meet the demand of the
regional power market. The commission shall request evidence
from the petitioner that demonstrates the existence of market
conditions supporting the construction of a merchant power plant
selling electric energy in the wholesale market at competitive
rates.".
Page 2, delete lines 10 through 21.
Page 2, line 32, after "construct a" insert "
new".
Page 2, line 37, delete "not earlier than two hundred seventy" and
insert "
within two hundred seventy (270) days after the filing of the
petitioner's case in chief. The commission may suspend the
running of the two hundred seventy (270) day period if the
commission finds that:
(1) the petitioner did not file its case in chief in sufficient
detail to allow the commission to begin a review of the
request;
(2) the petitioner materially altered the petitioner's case in
chief after its filing;
(3) an order compelling production by the petitioner of
discovery has not been satisfied within the time provided in
the order; or
(4) the commission temporarily lacks jurisdiction over the
proceeding due to the filing of an interlocutory judicial
appeal of a commission ruling or order.
The suspension ends and the two hundred seventy (270) day
period continues to run as soon as the petitioner cures the cause
for suspension.".
Page 2, delete line 38.
Page 3, line 23, after "plant's" insert "
potential".
Page 3, line 24, delete "effect" and insert "
impact".
Page 3, line 26, delete "effect" and insert "
impact".
Page 3 line 28, delete "effects" and insert "
impacts".
Page 4, delete lines 6 through 42 and insert the following:
"
Sec. 11. A petitioner shall provide to the commission an
assessment of the proposed merchant power plant's effect on the
water resource and its users. The assessment shall be prepared by
a licensed professional geologist (as defined in
IC 25-17.6-1-6.5
) or
an engineer license under
IC 25-31-1.
The assessment must
include, but not be limited to, the following information:
(1) Sources of water supply.
(2) Total amount of water to be used by the merchant power
plant from each source.
(3) Location of wells or points of withdrawal.
(4) Ability of the water resource to meet the needs of the
merchant power plant and other users.
(5) Ability of the water resource to meet the future needs of
the county in which the proposed merchant power plant will
be located.
(6) Alternative sources of water supply.
(7) Conservation measures proposed by the petitioner for
reducing the merchant power plant's effect on the water
resource.
(8) Studies evaluating the availability of and most practical
method of withdrawal, development, and use of the water
resource.
(9) A method for metering or other reasonable measuring of
water withdrawals and reporting of the measurement to the
commission.
(10) Any other information related to water resource
assessment the commission may require.".
Page 5, delete lines 1 through 11.
Page 5, line 15, after "one (1) of the following" insert "
financial
instruments".
Page 5, line 15, after "combination of the following" insert
"
financial instruments".
Page 5, delete lines 19 through 42, begin a new line block indented
and insert:
"
(1) A surety bond.
(2) A letter of credit.
(3) A certificate of insurance.
(4) A financial test.
(5) A corporate guarantee.
(6) Any other financial guarantee approved by the
commission.
(b) The petitioner shall prepare a cost estimate that contains a
detailed estimate of the costs associated with fully decommissioning
the facility and returning the site to its prior condition.
(c) The financial instrument selected and used by the petitioner
under this section must be sufficient to cover costs contained in the
cost estimate.
(d) The petitioner must submit a copy of current cost estimates
and the financial instrument to the commission for approval within
sixty (60) days of the approval by the commission of the petition.".
Page 6, delete lines 1 through 12.
Page 6, line 14, delete "testimony" and insert "
the petitioner's case
in chief".
Page 8, line 39, after "to" insert "
the siting approval of".
Page 9, line 4, delete "IC 6-1.1-8-1".
Page 9, line 38, delete "Except as provided in subsection (c), a" and
insert "
A".
Page 9, delete line 42.
Page 10, delete lines 1 through 17.
(Reference is to SB 209 as introduced.)
and when so amended that said bill do pass .
Committee Vote: Yeas 9, Nays 0.
____________________________________
Senator Merritt, Chairperson
AM 020903/DI 103 2003